4

Mapping the real station structure in the »PLC Designer«

4.4

Configuring I/O modules on the CANopen bus coupler module

28

Lenze · I/O system 1000 · commissioning guidelines for the PLC Designer · DMS 1.2 EN · 11/2012 · TD05

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4.4.2

Restart

When the program starts, the control initialises the I/O system. It changes to the "Operational"

status. While the control initialises the I/O system, the »PLC Designer« must not be online on the

same SDO channel.
There are different methods for restarting the I/O system: automatically with the »PLC Designer«,

or automatically with the factory adjustment (see below).
For the corresponding settings, first tick the "Expert settings" on the CANopen Remote Device tab.

Automatically
You want the control to automatically initialise the I/O system after the device has been replaced.

• Enter all required parameter values on the Service Data Objects tab.
• On the CANopen Remote Device tab ...

• do not tick the "Factory Settings" in order that the control does not execute a factory

adjustment;

• tick "Create all SDOs" in order that the control initialises all parameters.

• After the I/O system has been changed: Set the node address and the baud rate at the coding

switch and then start the control.