Installing the torque module, Installing the torque module -12 – Dynojet 250i: Torque Module User Manual

Page 16

Advertising
background image

Torque Module Installation and User Guide for Model 250i Dynamometers

C H A P T E R 1
Torque Module Installation

1-12

I

NSTALLING

THE

T

ORQUE

M

ODULE

1

Verify the main dyno power is disconnected. Refer to page 1-3 for more
information.

2

Turn off the main power switch on the CPU Module on the dyno electronics and
unplug the power cord.

3

Remove the dust cover from the existing top module.

Figure 1-13: Remove Dust Cover

4

Loosen the top right screw on the back of the existing top module.

5

Plug the Torque Module into the existing top module. Place the dust cover,
removed in step 3, on the Torque Module.

6

Secure the grounding strap on the back of the Air Fuel Module to the existing top
module.

Figure 1-14: Secure Grounding Strap

dust cover

power cord

input

power switch

grounding strap

Advertising