Routing the load cell cable, Routing the load cell cable -14 – Dynojet 250i: Torque Module User Manual

Page 18

Advertising
background image

Torque Module Installation and User Guide for Model 250i Dynamometers

C H A P T E R 1
Torque Module Installation

1-14

R

OUTING

THE

L

OAD

C

ELL

C

ABLE

1

Route the load cell cable from the eddy current brake through the air hole in the
drum bulkhead, under the carriage assembly bulkhead, and over to the dyno
electronics.
Make sure the load cell cable is clear of any power cables or hot or rotating
objects.

2

Secure the load cell cable with a zip tie to the underside of the carriage assembly
bulkhead.
Make sure there is enough slack in the cable to allow the dyno electronics
enclosure to slide out of the dyno.

Figure 1-16: Routing the Load Cell Cable

torque module

load cell cable

air hole in drum

bulkhead

route cable under

carriage assembly

bulkhead

Advertising