Dynojet 250i: Torque Module User Manual

Page 19

Advertising
background image

TO R Q U E M O D U L E I N S T A L L A T I O N

Torque Module Installation

Version 2

Torque Module Installation and User Guide for Model 250i Dynamometers

1-15

3

Route the load cell cable through the cable clamp on the back of the dyno
electronics enclosure.
3a

Loosen the two screws and lift the clamp up to slide the load cell cable
through.

3b

Secure the clamp with the two screws.

4

Attach the 9-pin connector on the load cell cable to the front of the Torque
Module and tighten down the screws.

5

Attach the power cord to the dyno electronics and turn the power switch on.

Figure 1-17: Route the Cable to the Torque Module

torque module

cable clamp

load cell cable

Advertising