Dynojet 250i: Torque Module User Manual
Page 19
Advertising
TO R Q U E M O D U L E I N S T A L L A T I O N
Torque Module Installation
Version 2
Torque Module Installation and User Guide for Model 250i Dynamometers
1-15
3
Route the load cell cable through the cable clamp on the back of the dyno
electronics enclosure.
3a
Loosen the two screws and lift the clamp up to slide the load cell cable
through.
3b
Secure the clamp with the two screws.
4
Attach the 9-pin connector on the load cell cable to the front of the Torque
Module and tighten down the screws.
5
Attach the power cord to the dyno electronics and turn the power switch on.
Figure 1-17: Route the Cable to the Torque Module
torque module
cable clamp
load cell cable
Advertising