0 installation, 1 unpacking and assembly, 2 enclosure disassembly – Rice Lake 420 Plus HMI Digital Weight Indicator Installation Manual User Manual

Page 10: 3 cable connections, Installation

Advertising
background image

6

420 Plus Installation Manual

2.0

Installation

This section describes procedures for connecting load

cells, digital inputs, and serial communications cables

to the

420 Plus

indicator. Instructions for field

i n s t a l l a t i o n o f t h e a n a l o g o u t p u t o p t i o n a nd

replacement of the CPU board are included, along with

assembly drawings and parts lists for the service

technician.

CAUTION

Use a wrist strap to ground yourself and protect
components from electrostatic discharge (ESD)
when working inside the indicator enclosure.

This unit uses line fusing which could create an
electric shock hazard. Procedures requiring work
inside the indicator must be performed by
qualified service personnel only.

The supply cord serves as the main power
disconnect for the

420 Plus

. The power outlet

supplying the indicator must be installed near the
unit and be easily accessible

2.1

Unpacking and Assembly

Immediately after unpacking, visually inspect the

420

Plus

to ensure all components are included and

undamaged. The shipping carton should contain the

indicator with attached tilt stand, this manual, and a

parts kit. If any parts were damaged in shipment, notify

Rice Lake Weighing Systems and the shipper

immediately.
The parts kit (PN 85219) contains the items listed

below:

Two, six-position screw terminals (PN 70599)

for connectors J4 & J1, two, three-position

screw terminals (PN 71125) for connectors J2

and J3, and one, four-position screw terminal

(PN 71126) for connector J6 (see figure 2-4).

Two 8-32NC x 7/16 fillister head screws (PN

30623).

Four 8-32NC x 3/8 machine screws (PN

14862) for the indicator backplate (see #1 in

Figure 2-8 13).

Six neoprene washers (PN 45042) for

backplate screws included in the parts kit.

Four rubber bumpers (“feet”) for the tilt stand,

(PN 42149).

Three reducing glands (PN 15664).

One capacity label (PN 42350).

Three each of grounding clamps (PN 53075),

external tooth lock washers (PN 15133), and

k e p n u t s ( P N 1 4 6 2 6 ) f o r c a b l e s h i e l d

grounding against the enclosure.

One SEC C (section cap) and CLC

(Concentrated Load) (PN 85552) label.

Annunciator labels (PN 85555), replacement

overlay decals for labeling primary and

secondary units LEDs.

2.2

Enclosure Disassembly

The indicator enclosure must be opened to connect

cables for load cells, communications, digital inputs,

and analog output.

WARNING

The

420 Plus

has an on/off switch for the

load cells and processor functions. Before
opening the unit, ensure the power cord is

disconnected from the power outlet. The power outlet
must be located near the indicator to allow the operator to
easily disconnect power to the unit.

Ensure power to the indicator is disconnected, then

place the indicator face-down on an antistatic work

mat. Remove the screws that hold the backplate to the

enclosure body, then lift the backplate away from the

enclosure and set it aside.

2.3

Cable Connections

The

420 Plus

provides four cord grips for cabling into

the indicator: one for the power cord, three to

accommodate load cell, communications, digital

inputs, and analog output cables. Two of the three free

cord grips come with a plug installed to prevent

moisture from entering the enclosure. Depending on

your application, remove the plug from any cord grip

that will be used and install cables as required.

Note

The unit will keep the date and time as long as
it is plugged in, Even if display and load cells
are turned off. When the unit is unplugged, it
will lose date and time information.

Figure 2-1 shows the recommended assignments for

the

420 Plus

cord grips.

Setup Switch
Access Screw

Communications Access
Cord Grip (Plugged)

Power Cord

Front of
Indicator

Backplate

Bottom View

Load Cell Cable
Cord Grip (Open)

Figure 2-1. Recommended Cord Grip Assignments

Advertising