11 cell covers, 12 load cell numbering, 11 cell covers 2.12 load cell numbering – Rice Lake TradeRoute HL Series - Installation and Service Manual (Legal-for-Trade) User Manual

Page 24

Advertising
background image

20

Trade

Route Installation Manual

2.11 Cell Covers

The final step in the mechanical installation is attachment of the load cell covers. Bolt the covers in position as

shown in Figure 2-19 with ¼

"

bolts and lock washers.

Load Cell Cover

Bolt and
Lock Washer

Figure 2-20. Load Cell Cover

2.12 Load Cell Numbering

Systems balanced at the factory

Systems that are balanced at the factory have load cell numbers already assigned. Connect numbered load cell

wires to the corresponding connector on the circuit board.

Systems balanced at installation

Systems that have not been balanced at the factory, but are to be balanced at installation, should follow the load cell

number convention shown below.

Cell #2

Cell #1

Cell #3

Figure 2-21. Load Cell Numbering for Three-Point System

Advertising