13 920i indicator junction box cable installation, Trade, Figure 2-23. junction box indicator terminal – Rice Lake TradeRoute HL Series - Installation and Service Manual (Legal-for-Trade) User Manual

Page 26: Figure 2-24. single-channel a/d card

Advertising
background image

JP4

JP 2

PT4

PT3

JP3

PT1

EXP

PT2

JP1

1

CELL4

1

CELL1

1

CELL3

1

CELL2

IND

-EX

-SI

SHD

+SI

+EX

M

R

N

I

-SI

S2 C

I

A

G

+EX

+SI

-SI

SHD

-EX

I

S

G

A
L

T

+SI

M

S

I

N

L

T

R

+EX

-EX

-SI

SHD

+SI

+EX

+SI

-EX

-SI

SHD

-EX

SHD

+SE

-SE

+EX

22

Trade

Route Installation Manual

Figure 2-23. Junction Box Indicator Terminal

2.13 920i Indicator Junction Box Cable Installation

The homerun cable has been installed by the factory. If required, attach cable from a junction box to an installed A/

D card, route the cable through the cord grip and ground the shield wire.
Next, remove connector J1 from the A/D card. The connector plugs into a header on the A/D card (see

Figure 2-23). Wire the load cell cable from the load cell or junction box to connector J1 as shown in Table 2-2.

SIG+

SIG–

SEN+

SEN–

EXC+

EXC–

J1

JP2

JP1

Figure 2-24. Single-Channel A/D Card

If using six-wire load cell cable (with sense wires), remove jumpers JP1 and JP2 before reinstalling connector J1.

For four-wire installation, leave jumpers JP1 and JP2 on. For six-wire load cell connections on dual-channel A/D

cards, remove jumpers JP3 and JP4 for connections to J2.

Advertising