Testing pump tubing. please wait, Press start to begin, Initializing lines – ANKOM TDF Dietary User Manual

Page 55: Start, Operator’s manual

Advertising
background image

Operator’s Manual


Rev E 12/2/14

pg. 55

20. Start the instrument.

The instrument is now completely set up and ready to automatically run the TDF procedure. Press the

START button to

begin. At the beginning of each new run, the instrument automatically runs a tube integrity test.

For the first run after a power-up cycle, or for the first run after the instrument has been idle for twelve hours, the
following screen will be displayed.

If the fluid lines are already charged properly, or when the line charge is complete, the following screen will be displayed.


When the tube integrity check is complete, the instrument will automatically execute the TDF procedure stopping only for
faults, aborts, and manual pH adjustment. The Status screen will show actions and faults as they occur during the
automatic operation.

Testing pump tubing.

Please wait..........

Initializing lines…

Amylase

EtOH78

Protease

EtOH95

AMG

Water

HCL

Buffer

Vacuum sensor:

AAAA

psi

Press START to begin

AOAC 985.29 TDF

START

Advertising