Operator’s manual – ANKOM TDF Dietary User Manual

Page 91

Advertising
background image

Operator’s Manual


Rev E 12/2/14

pg. 91

2. Open the pump doors.

2.1 Unscrew the six acorn nuts on the

back of the instrument and remove
the clear back panel to access the
pump area.

2.2 Un-latch the two pump doors so

they are open.

2.3 Reinstall the clear back panel and

tighten the acorn nuts.

When returning the instrument to service after a period of non-use, you must close
and latch the pump doors and charge all of the lines before running. See the
IDF/SDF Analysis, TDF Analysis, or Diagnostics sections of this manual for
information about charging the lines.

Acorn Nuts (the top two are behind the black torsion bar)

Cable Tie

Pump Doors

Advertising