5putting into operation – BUCHI NIRFlex N-500 User Manual

Page 44

Advertising
background image

5 Putting into operation

44

NIRFlex N-500 Operation Manual, Version F

5

Putting into operation

This section describes how the instrument is installed and gives instructions on initial startup.

To avoid damage by condensate moisture, special attention is needed when the instrument was deliv-
ered at cold temperatures. Do not remove the instrument from its plastic bag for at least two hours to
let the instrument acclimatize to the ambient temperature!

NOTICE

Risk of instrument damage by moisture condensate.

Let the instrument sufficiently acclimatize before unpacking

NOTE
Inspect the instrument package for damage immediately after delivery. If necessary, prepare a status
report immediately and inform customer and your local Buchi representative. Keep the original
packaging for future transportation.

5 .1

Transportation lock

The NIRFlex N-500 is equipped with a mechanical transportation lock to avoid damage of the inter-
ferometer during transportation and shipping by shocks and vibrations. The transportation lock is in
“Locked” position at initial delivery.

After system installation and prior use, the interferometer has to be unlocked! See following section for
information about unlocking.

NOTICE

Risk of instrument damage at use with engaged transportation lock.

Disengage the transportation lock prior use

Keep shocks and vibrations away

Advertising