BUCHI NIRCal User Manual

Page 164

Advertising
background image

NIRCal 5.5 Software Manual

164

NIRCal 5.5 Manual, Version A


RMSEP (Root Mean Square Error of Prediction): The RMSEP is an estimate of the random and
systematic errors in the predictions.

SEP (Standard Error of Prediction): The SEP is an estimate of the random error.


Slope and offset: The slope and offset of the regression line are both indicated in the figure above.
They are found as a linear model of the form y = ax+b, where y is the reference value, a is the slope, x
is the predicted value and b is the offset:


where X is the a n x 2 matrix with 1 in the first column and ŷ in the second column; y is a column vector
of reference values and

̂ is a two element column vector with the offset and slope.


RSD (Residual Standard Deviation): This estimates the random error corrected with the slope.


RMSEP vs SEP vs RSD: The three estimates of random errors each include

RMSEP: Random error + systematic slope + bias

SEP: Random error + systematic slope

RSD: Random error




Slope and bias correction

If the prediction protocol is based on an independent test set, then the slope and offset calculated in
the prediction protocol can be used directly in the management console to make slope and bias
correction. Notice that the offset value from the prediction protocol must be entred in the bias
field.

Advertising