A CAUTION

■ Do not touch the terminal board when power is

■ Do not touch the main body when high temperature

supplied.

fluid is being measured.

Touching the terminal board when

The fluid raises the main body

V^y power is supplied can cause

temperature and can cause bums.

DON’T

6l®ctric shock.

DON’T

6.1 Preparatory check

Follow the procedure described below to prepare before starting the flow measurement
(described with regard to the entire flowmeter).

System Check

Check the items listed below

Check the wiring between the converter and related instruments.

Make sure all the bolts of connection flanges on which the flowmeter is mounted
securely tightened.
Make sure the direction of flow arrow is in accordance with actual flow.

Make sure the flowmeter is grounded with 100 ohm or less ground resistance.

Make sure the converter housing covers are securely tightened.

Placing System On-Stream

Let the fluid go through the detector pipe. (Note 1)

When the detector is filled with the fluid, stop the fluid and keep it still in the detector pipe.

Supplying Electric Power

Make sure the power supply is as specified.

Checking Converter Parameters

Check the configuration parameter settings. Refer to Chapter 7, “LCD Display and

Controls,” Chapter 8, “Configuration Parameter Setting,” and Chapter 11,

“Communications Function.”

Zero Adjustment

Wait for 30 minutes to warm up the flowmeter. Then making sure the fluid holds still in the

detector pipe, starts the zero adjustment.

Refer to 6.2, “Zero Adjustment.”

On-line measurement

■ After checking the items and conducting the zero adjustment as listed above, let the fluid go

through the detector pipe. Output (4-20 mA dc) directly proportional to the flow rate can be

obtained.

Note 1: If the detector pipe is not filled with the fluid to be measured, the flow rate will be

indefinite and unable to be measured. Before using the flowmeter , be sure to fill the detector

pipe the fluid to be measured.

-