Conair GB User Manual

Page 8

Advertising
background image

2. Slide the WEIGH BIN into position. It rests behind the clear

hinged access window. Install with the air cylinder toward you.
If bin is already in place, remove any shipping materials, packing
tape or string.

3. Hang the Color and Additive Feeders:

a. Lift side latches and fully extend slide assembly. Remove the
hopper. Leave slide extended.

b. Tilting the entire slide assembly, motor end up, insert one
corner of hanger cross bar behind frame corner post.

c. Rotate assembly into place so both ends of cross bar are behind

corner posts.

d. Lower into place, bottom edge resting on frame and cross bar
properly positioned behind corner posts.

e. Re-install hopper. Slide motor forward until latches engage.

4. Place the controller on the support tray and plug in all cords:

a. Air solenoid 8 or 14 pin plug into the matching receptacle.
b. Auger feeder drive motors into duplex receptacle.
c. Mixer motor into right side of controller.
d. Sensor cord plug into right side of controller.
e. Load Cell plug into port on left side of controller.

5. Plug the CONTROLLER into the receptacle located under the
controller tray.

IMPORTANT: Do NOT plug the controller into a separate power

source. The controller ground path MUST be the same as
the blender frame ground path. If your system has the
controller located in a remote location, MAKE CERTAIN
that the power to the controller comes from the
receptacle mounted on the Blender frame.

6. Plug the power cord coming from this box into a 110 volt power
source (220 volt outside U.S.). This cord MUST provide the ONLY
power source for the entire system, including the controller.
See: WIRING CONSIDERATIONS, next page. 1800 series blenders also

require a 240 volt power source for the mix motors.

7. Connect air pressure to the unit. About 80 psi (5.5 bar) is
recommended (40 psi for the Micro Blender). Lubricated air is NOT
recommended.

NOTE: GBM Micro Blenders should be set to 40 psi (2.7 bar).
The Vertical Valves used in removable hoppers on Micro
Blenders, 100, and 200 series blenders are more accurate at

the lower 40 psi pressure setting.

8. Remove all protective paper from the plastic windows.

Page 9

Advertising