Series 300 floor mounting – PRG DMX Reference Guide 5.4 User Manual

Page 75

Advertising
background image

DMX512 REFERENCE GUIDE

67

Series 300 Floor Mounting

A Series 300 luminaire may be mounted in an upright floor position using a Series 300 floor stand. The floor stand
(22.9634.0161) includes all necessary hardware as shown in Figure 3-19.

To install floor stand:

Step

1. Orient pigtail cable as shown in Figure 3-19 DETAIL B and rotate pan tube accordingly.

Step

2. Secure pivoting legs to pan tube using, on each pivoting leg, one 5/16-18 bolt and nut; with two clutch disc

springs, and one 1/4" flat washer between the bolt and the leg, one 1/4" flat washer between the leg and
the pan tube.

Be sure to install disc springs with concave surfaces facing the flat washer.

Step

3. Tighten nuts and bolts until there is proper tension: just enough so pivoting legs stay in place, but not so

much that the legs don’t pivot. See Figure 3-19 DETAIL A.

Figure 3-19: Installing Floor Stand

Step

4. Place luminaire in desired floor position observing proper clearances.

Step

5. Connect input pigtail cable to Series 300 Lamp Run Cable which is connected to a Smart Repeater or

Smart Repeater Plus unit.

Pigtail Cable

5/16-18 x 1" Grade 5 Bolt (one per leg)

1/4" Flat Washer (two per leg)

Clutch Disc Spring

5/16-18 Nut w/ Nylon

PIVOTING LEG

FIXED LEG

PIVOTING LEG

Insert (one per leg)

(2 per pivoting leg)

FIXED LEG

PIVOTING LEG

PIVOTING LEG

Disc springs should be installed
with concave surfaces facing down

Pivoting legs should
be installed so that
they pivot, yet stay in

place after opening

FIXED LEG

PIVOTING LEG

PIVOTING LEG

DETAIL A

DETAIL B

S300 Floor Stand Assembly
(22.9634.0161)

Rubber Bumper (3)

1/4" Flat Washer (two per leg)

Advertising