Move the bin to approximate location, Uncrate the machine section, Remove the front top, and side panels – Carrier 26H User Manual

Page 11: Installation, Carrier

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Carrier

INSTALLATION

26H

m

7. MOVE THE BIN TO APPROXIMATE

LOCATION

Move the bin as close as possible to the final lo­
cation before placing the machine section on top

of it.

8. UNCRATE THE MACHINE SECTION

Uncrate the machine section as shown in Figs. 3

and 4.

FIG. 3 - UNCRATING - REAR BOLTS

BOTTOM BOLT

9. REMOVE THE FRONT TOP, AND SIDE

PANELS

Remove the front, top, and side panels in that order
before moving the machine section.

FIG. 5 - REMOVING SCREWS HOLDING TOP

AND SIDE PANELS

10. PLACE MACHINE SECTION ON TOP OF BIN

AND BOLT IN POSITION

Remove the short front panel. Using the two cap­
screws in the cloth bag shipped with the bin, bolt
the machine section in place as shown in Fig. 6.

FIG. 4 ■ UNCRATING - BOTTOM BOLTS

FIG. 6 - BOLTING MACHINE SECTION TO BIN

II

26H-57PD

Advertising