Installing gauges, Pump down of compressor, Carrier – Carrier 26H User Manual

Page 25

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Carrier

S E R V I C E

26H

Hf

vl

2. INSTALLING GAUGES

a. Backseat suction and discharge shutoff valves.

b. Remove gauge plugs and install 1/8" MPT

X

1/4" flare half union coupling.

c. Attach 1/4" OD copper gauge line, flared at

both ends, to the couplings.

d. Attach suction and discharge gauges to these

lines, leaving connection slightly loose.

e. Crack the valve off back seat, allow a small

amount of refrigerant to escape, and tighten

the flare nut.

To read line pressures, turn the shutoff valves
slightly from the backseat position. If the gauge
needle vibrates, backseat the valve until there is
no vibration but the gauge still reads line pressure.

NOTE: To conserve refrigerant, use short lengths
of small bore tubing when installing gauges. This
unit is sensitive to charge and repeated installa­
tion and removal of gauges with necessary purging

of air will result in an undercharge of refrigerant.

SUCTION LINE
PRESSURE GAUGE

DISCHARGE LINE
PRESSURE GAUGE-

CHARGING HOSE ATTACHED TO THE SUCTION
VALVE WITH A 1/4" HALF UNION COUPLING

"FREON-12 DRUM

FIG. 11 - CHARGING MANIFOLD ATTACHED

FOR CHARGING UNIT

3. PUMP DOWN OF COMPRESSOR

If the refrigeration system must be opened at the
compressor, first "Pump Down". Proceed as follows:

1. Install a pressure gauge to the suction shut­

off valve.

2. Front seat the suction shutoff valve.

3. Front seat the oil return line shutoff valve

(on 26H5).

4. Operate the compressor intermittently until

the suction pressure gauge indicates 0 to 2
PSIG pressure is being maintained in the
crankcase.

5. With the compressor stopped, front seat the

discharge shutoff valve.

6. Loosen the discharge shutoff valve gauge

plug slightly and bleed off any remaining pres­

sure. The compressor can then be opened or

removed.

7. After repairing the compressor, evacuate and

purge it to remove residual air. Remove the
pipe plug from the gauge connection of the

discharge shutoff valve. Operate the com­

pressor for about 10 minutes. Place your thumb
over the discharge valve gauge connection^ at
the some time stopping the compressor. Crack
open the SUCTION shutoff valve, momentarily,
allowing a small amount of gas to enter the

compressor. Front seat the suction shutoff
valve immediately. A slight gas pressure
should not be felt against your thumb. Re­
place the pipe plug. The suction, discharge
and oil return line shutoff valves can now be
backseated and the machine is ready for op­

eration.

25

26H-57PD