High pressure switch, Front, 240, 160 a 100 lb. bins – Carrier 26H User Manual

Page 51: Carrier

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Carrier

S E R V I C E

26H

#

WITH PARTITION

Attach brackets to partition as shown in Fig. 33

and install the partition, Fig. 34. Run the capillary

along the top of the bin liner, down the crushed
ice side of the partition and then over the top of

the partition to the cube side.

31. HIGH PRESSURE SWITCH

This switch stops the unit if the head pressure ex­

ceeds 220 - 7 PSIG. It is located in the same
casing as the bin thermostat. This cut-out point
is set at the factory and cannot be changed in the
field.

N O T E : On start up the unit may cycle on and off
several times due to high head pressure. This is
normal. The number of times the unit cycles can
be decreased by turning the unit to "pump" for a
half minute and then restarting.

FRONT

FIG. 33 - SKETCH SHOWING BRACKET

ATTACHED TO PARTITION

In replacing this switch the entire control must be
changed. Pump down the compressor as explained
in Section 4.

240, 160

a

100 LB. BINS

FIG. 34 - SHOWING PARTITION INSTALLED IN BIN

51

26H-57PD

Advertising