26H

«

N O T E F O R M E D P R O J E C T I O N

F O R S P A C I N G S P R E A D E R

W A T E R

S P R E A D E R

I N P O S I T I O N

W A T E R

S P R E A D E R

R E M O V E D

FIG. 17 - WATER SPREADER PLATES

3. During the period of "Blowing the charge", re­

move screws and clamps from each side of
lower evaporator shroud, then lift shroud up­
wards as far as it will go. Capillary joints
are accessible on right side of unit.

4. Remove water distributor header.

5. After refrigerant charge is "blown", carefully

melt capillary, suction header and hot gas

header joints. Pull joints apart while applying

heat. On the left side of evaporator, melt
water trough overflow and safety overflow
which are "soft solder" joints and require

very little heat.

C A U T I O N : The capillary suction header and hot

gas header joints are Phos-copper which melts at
approximately 1400°F. Care should be taken not
to "over-heat" the Phos-co joints when melting or
making a connection.

6. Remove evaporator support bracket screws and

lift evaporator straight up.

7. Remove all spreader plates. Remove all scale

and clean. Place spreader plates in new

evaporator assembly.

8.

Position replacement evaporator in unit;

fasten supporting brackets.

9. Make all connections. If Phos-co is not avail­

able, silver solder maybe substituted. Pliers
may be used to guide capillary in place while

soldering. Make sure that no hard solder plugs
capillaries.

10. Fasten water header in place.

11. Check oil level of compressor. Refer to Sec­

tion 6.

12. Evacuate the refrigerant system. Refer to Sec­

tion 8.

13. Add refrigerant to system. Refer to Section 4.

14. Machine must be operated for many cycles to

check freezing and defrost time. While unit is
operating, check for refrigerant leaks. When
unit is satisfactory, replace evaporator shrouds
and panels.

15. When replacing the evaporator assembly, the

operation of the main control thermostat and

the safety overflow switch must be checked.