Use drill pipe correctly, Jt9 operator’s manual – Ditch Witch JT9 User Manual

Page 117

Advertising
background image

Systems and Equipment - 116

JT9 Operator’s Manual

Drill Pipe

CMW

®

Use Drill Pipe Correctly

Align the Joints

Always carefully align the male and female

ends of pipe before screwing them together.
Poor alignment can damage the threads and
destroy the usefulness of the joint.

Clamp Pipe Correctly

Clamp on pipe when joint is centered between
wrenches. Clamp only on the tool joint of the
drill pipe as shown. This portion of the drill pipe
is designed for clamping and is considerably
thicker and stronger than the rest of the pipe.

See “Clamp Pipe” on page 76 for more
information.

IMPORTANT: The first pipe drilled must be
in a straight line with the unit. A misaligned
pipe can damage threads on each pipe that
is added.

NOTICE: Clamping anywhere else on the
pipe will weaken the pipe. Pipe can later
break, even when operating under normal
loads.

Advertising