Add pipe, Jt9 operator’s manual – Ditch Witch JT9 User Manual

Page 82

Advertising
background image

JT9 Operator’s Manual

Conduct a Bore - 81

Add Pipe

CMW

®

Add Pipe

1.

Set engine throttle to full speed.

2.

Clamp pipe joint. See “Clamp Pipe” on page 76.

3.

Locate drill head.

4.

Engage front wrench until pipe is clamped and pressure develops.

5.

Slowly rotate spindle counterclockwise. Move carriage back as threads unscrew.

6. After threads are fully unscrewed, stop rotation and move carriage to back of frame, slowing down as

carriage approaches rear end.

7.

Connect Pipe. See “Connect Drill Pipe” on page 79.

8.

Ensure that pipe fills and fluid pressure begins to rise.

9.

Rotate spindle.

10. Slowly move carriage forward. Adjust rotation speed control according to bit size and soil conditions.

11. Monitor gauges.

12. Locate drill head with tracker at least every half-length of pipe.

Advertising