Lift, Haul, Load – Ditch Witch JT9 User Manual

Page 67: Jt9 operator’s manual

Advertising
background image

Transport - 66

JT9 Operator’s Manual

Lift

CMW

®

Lift

This machine is not configured for lifting. If the machine must be lifted, load machine into a container or
onto a platform appropriate for lifting. See “Specifications” for weight of machine.

Haul

Load

1.

Start drilling unit engine.

2.

Move drilling unit to rear of trailer and align with ramps.

3.

Slow engine to low throttle and slowly drive unit onto trailer.

4.

Lower stabilizer and drill frame to trailer floor.

5.

Stop engine when unit is safely positioned on trailer bed.

6. Attach tiedowns to drilling unit where indicated on page 67.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

To help avoid injury:

Load and unload trailer on level ground.

Verify that trailer wheels are blocked.

Incorrect loading can cause trailer swaying.

Attach trailer to vehicle before loading or unloading.

Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help
prevent trailer sway.

Advertising