Assemble drill string, Prepare beacon housing, Attach transition sub – Ditch Witch JT9 User Manual

Page 78: Jt9 operator’s manual

Advertising
background image

JT9 Operator’s Manual

Conduct a Bore - 77

Assemble Drill String

CMW

®

Assemble Drill String

Prepare Beacon Housing

1.

Select nozzles and bit.

2.

Insert nozzle into beacon housing.

3. Attach bit (2) to beacon housing (1).

4.

Install beacon, following beacon instructions for:

battery replacement

beacon positioning

5.

Install beacon housing lid. See “Beacon Housings”
on page 108.

6.

Follow beacon instructions to check beacon operation.

7.

Follow tracker instructions to calibrate beacon.

Attach Transition Sub

Use either machine torque or quick wrench to attach transition sub (3) to beacon housing (1).

Machine Torque

1.

Pull transition sub into front wrench.

2.

Close wrench.

3.

Lube joints.

4.

Slowly make up joint.

5.

Use full machine torque to tighten joint fully.

IMPORTANT: A variety of nozzles and bits
are available to suit your particular job
conditions. See “Downhole Tools” on
page 107 for more information, or contact
your Ditch Witch

®

dealer.

Advertising