Check supplies and prepare equipment, Check supplies, Jt9 operator’s manual – Ditch Witch JT9 User Manual
Page 60
JT9 Operator’s Manual
Prepare - 59
Check Supplies and Prepare Equipment
CMW
®
Check Supplies and Prepare Equipment
Check Supplies
•
receiver/transmitter or tracker with spare batteries
•
beacons with new and spare batteries
•
two-way radios with new and spare batteries
•
•
transition sub
•
anchoring equipment and accessories
•
bits, screens, nozzles (see page 107)
•
adapters, pipe, beacon housings
•
marking flags or paint
•
water and additional hoses
•
fuel (Use low sulfur or ultra low sulfur fuel only.)
•
drilling fluid additives (see page 99)
•
spare fuses
•
keys
•
backreamers, swivels, pulling devices (see page 107)
•
wash down hose and spray gun
•
duct tape
•
spray lubricant
•
tool joint compound (see page 128)
•
electrically insulating boots and gloves
•
personal protective equipment, such as hard hat and safety glasses
•
notepad and pencil