Jt9 operator’s manual – Ditch Witch JT9 User Manual

Page 69

Advertising
background image

Transport - 68

JT9 Operator’s Manual

Haul

CMW

®

Attach chains at front and rear tie-down points (shown). Make sure chains are tight before transporting

unit.

IMPORTANT: Drill frame must be lowered to trailer floor before attaching chains.

Advertising