Ditch Witch JT2020 User Manual

Page 146

Advertising
background image

JT2020 Mach 1 Operator’s Manual

Systems and Equipment - 145

Pipeloader

CMW

Remove Single Pipe

Unload all drill pipe loaded with auxiliary pipe loaders.

1.

Lift, rotate, and lock pipe positioning aid (3) into
stowed position.

2.

Ensure pipe box is positioned properly. See “Shift
Pipe Box” on page 141.

3.

Move shuttles out fully.

4.

Pull pin (2) on shuttle, rotate auxiliary pipe loader
(1) down, and install pin.

5.

Repeat process for other shuttle.

6.

Raise pipe.

7.

Move pipe to auxiliary pipe loaders.

Move shuttles in.

Lower pipe into auxiliary pipe loaders.

8.

Move shuttles out.

9.

Remove pipe from auxiliary pipe loaders and store properly.

10. Repeat steps 5-8 to unload remaining added drill pipe.

11. After all added drill pipe is unloaded with auxiliary pipe loaders:

Close both auxiliary pipe loaders.

Step away from pipeloader.

Finish loading remaining drill pipe using standard procedure. See “Remove Pipe” on page 109.

Crushing weight. If load falls or moves it could kill or crush you.

Use proper procedures and equipment or stay away.

Advertising