Unload – Ditch Witch JT2020 User Manual

Page 89

Advertising
background image

Transport - 88

JT2020 Mach 1 Operator’s Manual

Haul

CMW

Unload

With Tiedown Kit

1.

Lower ramps.

2.

Remove tiedowns.

3.

Start drilling unit engine.

4.

Using tethered ground drive controller, pull power mode switch into low position.

See page 26.

5.

Raise stabilizers.

6.

Move drilling unit forward until track meets chock.

7.

Raise drill frame.

8.

Slowly back unit down trailer or ramps.

Without Tiedown Kit

1.

Lower ramps.

2.

Remove tiedowns.

3.

Start drilling unit engine.

4.

Using tethered ground drive controller, pull power mode switch into low position.

See page 26.

5.

Raise stabilizers.

6.

Raise drill frame.

7.

Slowly back unit down trailer or ramps.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

NOTICE:

Load and unload trailer on level ground.

Ensure trailer wheels are blocked.

Attach trailer to vehicle before loading or unloading.

Advertising