Unload – Ditch Witch JT2020 User Manual
Page 89
Transport - 88
JT2020 Mach 1 Operator’s Manual
Haul
CMW
Unload
With Tiedown Kit
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Using tethered ground drive controller, pull power mode switch into low position.
5.
Raise stabilizers.
6.
Move drilling unit forward until track meets chock.
7.
Raise drill frame.
8.
Slowly back unit down trailer or ramps.
Without Tiedown Kit
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Using tethered ground drive controller, pull power mode switch into low position.
5.
Raise stabilizers.
6.
Raise drill frame.
7.
Slowly back unit down trailer or ramps.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Ensure trailer wheels are blocked.
•
Attach trailer to vehicle before loading or unloading.