Backreaming, Backreaming tips, Leaving jobsite – Ditch Witch JT2020 User Manual

Page 63: Storing equipment

Advertising
background image

Operation Overview - 62

JT2020 Mach 1 Operator’s Manual

Backreaming

CMW

Backreaming

1.

Assemble backream string. See page 107.

2.

Start drilling unit and adjust throttle.

3.

Set drilling fluid flow. Check that fluid flows through all nozzles. See page 122.

4.

Remove pipe from bore. See page 109.

5.

Remove up to a single column of drill pipe from full box (see page 137) to complete backream.

6.

Remove pullback device. See page 111.

Backreaming Tips

Plan backreaming job before drilling. Plan bore path as straight as possible. Check bend limits of
pullback material. Check that appropriate pullback devices are on hand.

Keep all bends as gradual as possible.

Drilling fluid quality is a key factor in backreaming success. Contact your Ditch Witch dealer for
information on testing water, selecting additives, and mixing drilling fluid.

Backreaming requires more fluid than drilling. Make sure enough fluid is used.

Leaving Jobsite

1.

Remove downhole tools. See page 111.

2.

Remove anchors. See page 115.

3.

Rinse unit and downhole tools. See page 156.

4.

Disassemble strike system and disconnect from fluid system. See page 157.

5.

Stow tools. See page 157.

6.

Load unit onto trailer. See page 85.

Storing Equipment

1.

For cold weather storage, antifreeze drilling unit. See page 154.

2.

For long-term storage, disconnect battery disconnect switch.