Assemble drill string, Prepare beacon housing – Ditch Witch JT2020 User Manual

Page 98

Advertising
background image

JT2020 Mach 1 Operator’s Manual

Conduct a Bore - 97

Assemble Drill String

CMW

Assemble Drill String

Prepare Beacon Housing

1.

Select nozzles and bit.

2.

Insert nozzle into beacon housing.

3.

Attach bit (2) to beacon housing (1).

4.

Install beacon, following beacon instructions for:

battery replacement

beacon positioning

5.

Install beacon housing lid. See “Beacon Housings”
on page 131.

6.

Follow beacon instructions to check beacon operation.

7.

Follow tracker instructions to calibrate beacon.

IMPORTANT: A variety of nozzles and bits
are available to suit your particular job
conditions. See “Downhole Tools” on
page 130 for more information, or contact
your Ditch Witch dealer.

Advertising