Ditch Witch JT2020 User Manual

Page 40

Advertising
background image

JT2020 Mach 1 Operator’s Manual

Controls - 39

Gauge Cluster

CMW

6. Pipe lift status indicator If pipe lifter is lifted fully and

lift pressure switch is
engaged, light should be on.

If pipe lift pressure switch is
not engaged, light should be
off.

7. Front pipe box status

indicator

If active pipe column contains
pipe, light should be on.

If active pipe column does not
contain pipe, light should be
off.

IMPORTANT:

Check pipe box status lights to
see when active column of pipe
box is empty. See “Shift Pipe Box”
on page 141.

One light on and one light off
indicates a jammed pipe. See
“Correct Misaligned or Jammed
Pipe” on page 142.

8. Rear pipe box status

indicator

If active pipe column contains
pipe, light should be on.

If active pipe column does not
contain pipe, light should be
off.

IMPORTANT:

Check pipe box status lights to
see when active column of pipe
box is empty. See “Shift Pipe Box”
on page 141.

One light on and one light off
indicates a jammed pipe. See
“Correct Misaligned or Jammed
Pipe” on page 142..

Item

Description

Notes

Advertising