Drilling unit – Ditch Witch JT2020 User Manual
Page 187
Service - 186
JT2020 Mach 1 Operator’s
Manual
As Needed
CMW
Drilling Unit
Change Auto Lubricator TJC Pail
Check pipe auto lubricator TJC level and change pail as needed.
To change pail:
1.
Remove wingnuts and bolts attaching base ring (4) to pail cover (1).
2.
Rotate base ring slightly to clear hooks on cover and remove pail from cover.
3.
Remove follower plate (3) from empty pail and install into new pail. Press firmly on follower plate until
TJC comes up in center opening.
4.
Remove base ring from empty pail and install onto new pail.
5.
Install pail into place over pump dip tube. Use hooks on cover to support base ring.
6.
Install bolts and wingnuts.
7.
Remove cap (2) from discharge tee on pump. Operate pump until discharged TJC is free of air
pockets. Replace cap.