Chapter 6: maintaining the nano enclosure, Routine maintenance schedule – Labconco XPert Nano Enclosures 38876 Series User Manual

Page 32

Advertising
background image

Product Service 1-800-522-7658

27









Chapter 6:

Maintaining the Nano Enclosure

Monitoring airflow and changing the filters is the primary maintenance required.
Decontamination may be required and is reviewed in this chapter.

Review this chapter on maintenance for the following:

Routine Maintenance.

Decontamination.

Determination of when to replace the ULPA filter(s).

How to install a new ULPA filter with the bag-in/bag-out procedure.

Filter leak test.

Speed control adjustment and setting the inflow face velocity.

Operating and calibrating the airflow monitors.

Initial certification.

Re-certification.

Fluorescent light replacement.

Motorized impeller replacement.

Speed control replacement.

Maintenance on the Optional Ionizer.

Routine Maintenance Schedule

Weekly

Wipe down the interior surfaces of the enclosure with a disinfectant or

cleaner, depending upon the application.

Using a damp cloth, clean the exterior surfaces of the enclosure,

particularly the front and top to remove any accumulated dust.

Operate the exhaust system, noting the airflow velocity through the

enclosure using a source of visible smoke. Airflow monitors are
recommended for constant monitoring.

Advertising