8 response time (seconds), 9 maximum power per calendar, Response time (seconds) – CIRCUTOR MDC-20 User Manual

Page 35: Maximum power per calendar

Advertising
background image

MDC-20

User Manual

Page 35 of 58

The following fields must be configured when selecting the sliding blocks window:

Fig.8-12 . – Parameters to be configured in the sliding window

Integration time (seconds):Duration time of each of the N partial integration intervals

included in an Integration Period.

The Integration Period must be a multiple of the Integration Time (chapter
8.1.1).

Excess (%): Excess energy allowed in the integration subinterval always ensuring that

the total energy for the period is less than the configured maximum.

8.1.8 Response time (seconds)

Fig.8-13 . – Response times

Time between actions: This is the time established between actions. A value of 60

seconds means that once a load has been connected or disconnected, the controller will
wait 60 seconds before carrying out any other operation.

Non-reclosing time at end of period: Time before the end of an integration period,

during which no new loads are connected until a new integration period has begun.

8.1.9 Maximum power per calendar:

Within the maximum power calendar option you can configure a maximum set point power
according to a time discriminator or calendar, in cases in which the maximum power changes
are based on time intervals or other conditions.

Fig.8-14 . – Selection of calendar

Advertising