Tove, Nstallation – Avalon Firestyles 900 PI-1993 to 1996 User Manual

Page 13

Advertising
background image

S

TOVE

I

NSTALLATION

(C

ONT

.)

P

AGE

13

Horizontal Installation

The horizontal installation minimizes the amount of pellet vent needed by passing the pellet vent
through the wall with a thimble. Make sure to follow all of the requirements listed in the section
"Stove Requirements" as well as those listed below in the illustration. The steps below detail the
order of installation.

HINT:

Make sure to carefully plan the pellet vent route so that it always
maintains a 3" clearance to combustibles.

A

Install the floor protection.

B

Install the pellet vent. Make sure to follow the pellet vent manufacturer's instructions for
passing the vent through combustible walls. Screw together all pellet vent joints and seal.
Install the outside air connection (if applicable).

WARNING: Because this type of installation does not have any vertical rise to

create draft, we recommend using outside air with this type of
installation.

C

Place the pellet stove in position and attach the pellet vent and outside air connection (if
applicable). Screw together and seal the pellet vent connection to the stove.

D

Read the section "Operating the Heater" prior to plugging in the stove and operating.

Sidewall

Door
Opening

Floor protection

6"
Min.

9"

Min.

0"

0"

3"

Min.

Backwall

Outside
Air

1'
Min.

Approved

thimble

3"

Min.

Type

"L" Vent

Joints must be

screwed together

and sealed

45 elbow

pointed down or

pellet vent cap

Outside Air

Outside Air Termination
with 90 elbow or hood

Floor protection

Advertising
This manual is related to the following products: