Flowserve ISC User Manual

Page 6

Advertising
background image

0



5.5

!

Check equipment dimensions to ensure that they are within the
dimensions shown in Figures 1 and 2.
Critical dimensions include:
• Box Bore (ØC)
• Box Depth (G)
• Distance to First Obstruction (K)
• Pump Frame accomodates Gland OD (ØE)

5.6 Check gland bolting to ensure that bolt diameter and bolt circle

conform to the dimensions shown in Figure 2.

5.7

!

Handle the ISC with care, it is manufactured to precise toler-
ances.

The sealing faces of the ISC seal are the Primary Ring and the
Mating Ring.

They are lapped flat to within three light bands (0.9 µm).

Keep the seal faces perfectly clean at all times.

!

If the pump condition exceeds the above criteria ( including con-
sideration for thermal growth), consult Flowserve Application
Engineering for recommendations to avoid seal performance com-
promises.

Seal Chamber Requirements

The MS may be installed when there are no visible signs of

damage to the MS. This applies in particular to the seats,
centrings, and the statically sealing O-rings.

to first

obstruction

Face of seal housing to be square to the

axis of the shaft to within 0.003 inch (0.0

mm) FIM and have

√63-µ Inch (.6 µm) Ra

finish or better.
Gland pilot can be either of these register

locations. Concentric to within 0.005 inch

(0.3 mm) FIM of shaft or sleeve OD

Shaft or sleeve finish to be

32 µ inch (0. µm) Ra or better

Shaft or sleeve OD

+0,000 inch (+ 0,000 mm)

-0,002 inch (- 0,050 mm) ANSI
+0,000 inch (+0,000 mm) API 60

-0,00 inch (-0,025 mm) DIN / ISO

• Bearings must be in good condition.

• Maximum lateral or axial movement of shaft (end play) = 0.00 inch (0.25 mm) FIM

• Maximum shaft runout at face of seal housing = 0.002 inch (0.05 mm) FIM

• Maximum dynamic shaft deflection at seal housing = 0.002 inch (0.05 mm) FIM

Seal housing bore to have

√25

µ inch

Figure 1

Advertising