Connection to the unit

n

Remove the cover panel from the outdoor unit

if necessary. It may be necessary to remove

the pre-cut bushings.

n

Take off the factory-fitted protective caps. You

can use the union nuts for additional mounting.

Make sure to slide the union nuts onto the pipe

before it is flared.

n

Make connections to the device by hand ini-

tially, in order to ensure a good fit. Later,

tighten the joints with two open-end wrenches

Use one wrench to resist the rotation of the

other (Fig. 43).

2

1

Fig. 43: Tighten fittings

1: Tighten 1st Spanner

2: Counter 2nd Spanner

Copper piping Out-

side diameter

Tightening torque

3/8" = 9,52 mm

32 - 40 Nm

5/8" = 15,88 mm

65 - 75 Nm

n

The installed refrigerant pipes, including the

flare connections, must be provided with suit-

able insulation.

n

Special measures need not be taken for the

return of the compressor oil.

NOTICE!

Use only tools which are approved for use in

an HVAC environment. (z. B.: bending pliers,

pipe/tubing cutters, de-burrers and flaring

tools). Do not cut refrigerant pipes with a saw.

NOTICE!

All work must be carried out in a way that pre-

vents dirt, particles, water etc. from entering,

refrigerant lines!

Outdoor units may be delivered with nuts suit-

able for joining flanges.

8.2

Commissioning the

refrigeration system

Leak testing

Once all the connections have been made, the

pressure gauge station is attached to the Schrader

valve as follows (if fitted):

blue = large valve = suction pressure

Once the connection has been made successfully,

the leak test is carried out with dry nitrogen. Leak

testing involves spraying a leak detection spray

onto the connections. If bubbles are visible, the

connections have not been made properly. In that

case, tighten the connection or, if necessary,

create a new flange.

Pumping down to vacuum

After completing a successful leak test, the excess

pressure in the refrigerant piping is removed and a

vacuum pump with an absolute final partial pres-

sure of min. 10 mbar is used to remove all of the

air and empty the pipes. Any moisture present in

the pipes will also be removed.

NOTICE!

A vacuum of at least 10 mbar must be pro-

duced!