9 electrical wiring, 1 important information, 10 commissioning – REMKO WKF 120 Duo User Manual

Page 44: 1 control panel and information on commissioning, Electrical wiring 9.1 important information, Remko wkf duo, Electrical wiring, Commissioning

Advertising
background image

9

Electrical wiring

9.1

Important Information

CAUTION!

You can find information on the electrical connec-

tions of the indoor and outdoor unit, on the ter-

minal assignment of the I/0 module, as well as on

the circuit diagrams in the separate "Electrical

wiring" operating instructions

10

Commissioning

10.1

Control panel and

information on commissioning

The Smart Control is used to operate and control

the entire heating system. The Smart Control is

operated from the operating unit. The operating

unit is positioned on the basic device.

n

The unit is pre-installed at the factory. After a

reset of the Smart Control, the default parame-

ters are loaded.

n

An intensive visual inspection is to be carried

out before the actual commissioning.

n

Switch on the power supply.

n

Then the preinstalled data is loaded and the

parameters can be set with the help of the

commissioning wizard. You can find informa-

tion on this in the separate operating instruc-

tions of the Smart Control.

NOTICE!

Before commissioning the domestic water

storage will be filled.

REMKO WKF Duo

44

Advertising
This manual is related to the following products: