Setup and programming – Precision Digital PD6000 User Manual

Page 25

Advertising
background image

Model PD6000 Analog Input Process Meter Instruction Manual

25

SETUP AND PROGRAMMING


The meter is factory calibrated prior to
shipment to read in milliamps and volts
depending on the input selection. The
calibration equipment is certified to NIST
standards.

Overview

There are no jumpers to set for the meter input selection.
Setup and programming is done through the front panel buttons.
After power and input signal connections have been completed and
verified, apply power to the meter.

Advertising
This manual is related to the following products: