Heatiator C40 User Manual

Page 61

Advertising
background image

4/20/11

Heatilator • Constitution EPA Fireplace • 480-1091D

Page 61

NOTICE: Secure the duct so that clearance to the fireplace

outer wrap is maintained. Tape all seams with aluminum

tape 1-1/4 in. (32mm) minimum width or as specified by local

codes.)
9. Seal all the way around the inside of the Return Air Grille

to prevent hot air being drawn back into the venting system

using gasketing supplied with the kit. Leave 1/4 in. (6mm)

clearance from all 4 outer edges. Trim excess gasketing.

See Figure 11.7

Securely Twist

Lock B-Vent to

Adapter

Secure B-Vent to Fan Housing

with sheet metal screws

Return Air Grille

Install with Louvers

pointed down

Bracket

Can rotate

180

o

2 x 4 Wall

Fan Housing

1/2 in. (13mm)

clearance to

combustibles

must be

maintained.

2 x 4 wall

Sheet Rock

Seal grille using gasketing supplied with the kit

Leave 1/4" (6mm) clearance from

all 4 outer edges

10. Install the variable speed wall rheostat (with setting on

“OFF”) in a convenient location. This switch will control the

Heat-Zone fan operation.
11. Remove the Junction Box. Wire 110 VAC service TO the

wall rheostat and FROM the wall rheostat to the fan Junction

Box. Use wire nuts to secure the 110 VAC service wires to

the hot (black) and neutral (white) fan wires and screw the

110 VAC ground wire to the Junction Box. See Figure 11.8.
12. Secure the Return Air Grille to the fan housing making

sure it is flush. The grille must be installed with the louvers

pointing down.
NOTICE: DO NOT UsE ADJUsTABlE REGIsTERs.
13. Complete the fireplace installations as per the instruc-

tions found in your Owner’s Manual.

Figure 11.5

Figure 11.6

Figure 11.7

Junction Box Removed

Wire Clamp

Wire Nuts

Junction Box

Black

White

Figure 11.8

Advertising