Preparing the oven for installation, Figure 3, Stacking two ovens – Garland MP-GD-10-S User Manual

Page 10

Advertising
background image

Part # MPSM07 (03/24/08)

Page 10

Stacking Two Ovens

1 . Follow the instructions in the section entitled, “Legs and

Casters,” on page 5 . Then resume at step 2 on this page to

complete the stacking process .

2 . Move the lower oven as close to the final installation point

as possible, leaving enough space around the oven to

allow access for the remaining installation steps . If casters

have been installed, apply the brakes on the two front

wheels .

3 . Carefully raise the upper oven and place it on top of the

lower oven, aligning the four lower corners of the upper

even to the four upper corners of the lower oven .

4 . At the rear of the stacked ovens, install the stacking

bracket using six 1/4-20 x 1” hex head bolts with lock

washers and nuts . Firmly tighten all six nuts/bolts to

secure the ovens together .

PREPARING THE OVEN FOR INSTALLATION

5 . Remove the outer flue vent from the right top corner of

the rear of each oven, saving the screws .

6 . If they are not already fastened together, assemble the

two parts of the interconnecting flue channel included in

the stacking kit, using six #10 x 3/4” sheet metal screws .

7 . Fit the channel assembly over the flue vent area of each

oven and fasten using the screws removed in step 5 .

8 . If you have installed casters, be sure to install the restraint

bracket on the lower left corner of the rear of the upper

oven using two #10 x3/4” sheet metal screws .

9 . If your installation requires one common gas inlet for both

ovens, use the piping included with your stacking kit to

assemble the interconnecting gas pipe . Refer to Figure 3 .

NOTE: It is recommended, when stacking a Moisture + Oven

with a Master Convention Oven, that the Moisture + be

located on the bottom .

7

9

3

2

1

14

13

11

8

12

5

12

4

9

13

Figure 3 .

Item Reference Key For Figure 3

Item

No .

Item Description

1

MSCR-HH STL 1/4-20x3/4

2

LKSHR-SPL 1/4x1/2x1/6

3

Nut - Hex 1/4-20 STL ZP

4

Bell Reducer 1” x 3/4”

5

3/4 Tee NPT

7

Flue Assembly – Double Stack

8

Pipe Union 3/4 NPT

10

Close Nipple 3/4 x 1

11

Pipe 3/4 x 20-1/2”

12

3/4 x 3-1/2 Nipple

13

Bell Reducer

14

Stacking Bracket Rear

Advertising
This manual is related to the following products: