Evaporative cooling with auto drain and fill, Install the water supply line, Install the drain line – Greenheck Fan Make-Up Air Unit 470658 MSX User Manual

Page 11: Check/adjust water level

Advertising
background image

11

®

Model MSX Make-Up Air

Evaporative Cooling with Auto Drain and Fill

continued

1. Install the Water Supply Line

Supply line opening requirements vary by unit size
and arrangement and are field supplied. Connect the
water supply line to the float valve through the supply
line opening in the evaporative cooling unit. Install the
1/2 in. normally closed solenoid (Valve A) in the supply
line. Install the 1/4 in. normally open solenoid (Valve
B) between the supply line and the drain line. Refer
to Auto Drain & Fill Evaporative Piping drawing on
previous page.

2. Install the Drain Line

Connect an unobstructed drain line to the sump drain
overflow connection. Install the 3/4 in. normally open
solenoid (Valve C)
between the sump
drain connection
and the drain line.
A trap should be
used to prevent
sewer gas from
being drawn into
the unit.

3. Check/Adjust Water Level

Check the water level in the sump tank. The water
level should be above the pump intake and below the
overflow. Adjust the float as needed to achieve the
proper water level.

6 in. min.

6 in. min.

Drain Trap

Advertising