19

®

Model MSX Make-Up Air

1. Check the Installation

The media may have been removed during installation,
so its orientation
should be double
checked. The
media should
be installed with
the steeper flute
angle sloping
down towards
the entering air
side.
Verify that the stainless steel caps and distribution
headers are in place. The headers should be located
over the media towards the entering air side. The caps
should be placed over the headers.

2. Check the Pump Filter

Check that the pump filter is around the pump inlet.

3. Fill the Sump and Adjust the Float

Turn on the water supply and allow the sump tank to
fill. Adjust the float valve to shut-off the water supply
when the sump is filled to within 1 inch of the bottom
of the overflow.

4. Break-in the Media

Open the bleed-off valve completely and saturate
the media with the blower(s) off for no less than 20
minutes.

5. Check the Flow Rate

The pumps should provide enough water to saturate
the media in 45 to 60 seconds. Consult the factory, if
adequate flow is not achieved.

6. Adjust the Water Bleed-Off Rate

The water bleed-off rate is dependent on the water’s
mineral content. The bleed-off should be adjusted
based on the media’s mineral deposits after two
weeks of service.

7. Set the Optional Auto Drain and Fill

Set the auto drain, fill timer and temperature settings.
Timer settings are: t1: 1.0, 10min

t2: 0.4, 60h

Temperature is typically set to 45°F (7°C)

Start-Up - Evaporative Cooling

Recirculating (optional)

Bleed-Off

Valve

Overflow

Pump

Filter

Threaded Float

Adjustment

Supply

Connection

Float

Valve

Evaporative

Timer

t2 settings

t1 settings

Evaporative Freeze

Protection

Temperature

Setting

8. Put the Unit into Service

Remove the jumper, and energize the blower(s). Verify
proper operation.

IMPORTANT

Check the media for minerals after two weeks of
service and adjust the bleed-off rate accordingly.

Leaving Air

Entering Air

45º

15º

Media Orientation

Evaporative Cooler Set-Up

NOTE

A jumper will need to be installed in the control
center to power the evaporative pumps with the
blower(s) off. Reference the unit’s ladder diagram to
determine proper terminals.