Energized parts charts – Manitowoc Ice MARINE MODEL S1800 User Manual

Page 39

Advertising
background image

Section 6

Electrical System

Part Number 80-1634-3

6-1

Section 6

Electrical System

Energized Parts Charts

SELF-CONTAINED WATER-COOLED MODELS

1. Initial Start-Up or Start-Up After Automatic Shut-Off
* Not Used on all Models

Condenser Fan Motor
The fan motor is wired through a fan cycle pressure control, therefore,
it may cycle on and off.
Harvest Water Purge
The circuit board has an adjustable water purge in the harvest cycle.
This permits a 0 or 45 second purge cycle.
Auto Shut-Off
The ice machine remains off for 3 minutes before it can automatically
restart. The ice machine restarts (steps 1-2) immediately after the
delay period, if the bin switch re-closes prior to 3 minutes.

Safety Timers
The control board has the following non-adjustable safety timers:

The ice machine is locked into the freeze cycle for 6 minutes,
before a harvest sequence can be initiated. The freeze lock is
bypassed when the toggle switch is moved from the OFF to ICE
position on the first cycle only.

The maximum freeze time is 60 minutes, at which time the control
board automatically initiates a harvest sequence (steps 5-6).

The maximum harvest time is 3-1/2 minutes, at which time the
control board automatically terminates the harvest sequence. If
the bin switch is open, the ice machine will go to automatic shut-off
(step 7). If the bin switch is closed, the ice machine will go to the
freeze sequence (steps 3-4).

Ice Making

Sequence Of

Operation

Control Board Relays

Contactor

Length

Of Time

1

2

3

4

5

6

7

7A

7B

Water
Pump

Harvest

Valve

(Left)

Harvest

Valve

(Right)*

Air

Comp.*

Water

Inlet

Valve

Dump

Valve

Contactor

Coil

Comp.

Cond.

Fan

Motor

START-UP

1

1. Water Purge

On

On

On

(when

used)

35 sec.

Off

10 sec.

On

Off

On

Off

Off

Off

45 Seconds

2. Refrigeration

System Start-Up

Off

On

Off

Off

On

Off

On

On

Off

5 Seconds

FREEZE

SEQUENCE

3. Pre-Chill

Off

Off

Off

Off

May

Cycle

On/Off

during

the first
45 sec.

Cycles

Off, then

On one

more

time

Off

On

On

May Cycle

On/Off

Initial Start-Up
is 60 Seconds

30 Seconds

thereafter

4. Freeze

On

Off

Off

Off

Off

On

On

May Cycle

On/Off

Until 10 sec.

water contact

with ice

thickness

probe

HARVEST

SEQUENCE

5. Water Purge

On

On

On

On; after

35 sec.

30 sec.

Off,

15 sec.

On

On

On

On

May Cycle

On/Off

Factory-set at

45 Seconds

6. Harvest

Off

On

On

On

Off

Off

On

On

May Cycle

On/Off

Bin switch

activation

7. AUTOMATIC

SHUT-OFF

Off

Off

Off

Off

Off

Off

Off

Off

Off

Until bin

switch

re-closes &

3 min. delay

Advertising