Important – Manitowoc Ice MARINE MODEL S1800 User Manual

Page 88

Advertising
background image

Refrigeration System

Section 7

7-22

Part Number 80-1634-3

Self-Contained Charging Procedures

1. Be sure the toggle switch is in the OFF position.

Figure 7-9. Charging Connections

2. Close the vacuum pump valve, the low side service

valve, and the low side manifold gauge valve.

3. Open the high side manifold gauge valve, and

backseat the high side service valve.

4. Open the charging cylinder and add the proper

refrigerant charge (shown on nameplate) through
the discharge service valve.

5. Let the system “settle” for 2 to 3 minutes.

6. Place the toggle switch in the ICE position.

7. Close the high side on the manifold gauge set. Add

any remaining vapor charge through the suction
service valve (if necessary).

NOTE: Manifold gauges must be removed properly to
ensure that no refrigerant contamination or loss occurs.

8. Make sure that all of the vapor in the charging hoses

is drawn into the ice machine before disconnecting
the charging hoses.

A. Run the ice machine in freeze cycle.

B. Close the high side service valve at the ice

machine.

C. Open the low side service valve at the ice

machine.

D. Open the high and low side valves on the

manifold gauge set. Any refrigerant in the lines
will be pulled into the low side of the system.

E. Allow the pressures to equalize while the ice

machine is in the freeze cycle.

F. Close the low side service valve at the ice

machine.

G. Remove the hoses from the ice machine and

install the caps.

Important

The charge is critical on all Manitowoc ice
machines. Use a scale or a charging cylinder to
ensure the proper charge is installed.

MANIFOLD SET

CLOSED

FRONTSEATED

CHARGING

CYLINDER

VACUUM PUMP/

RECOVERY UNIT

OPEN

CLOSED

LOW SIDE

SERVICE

VALVE

HIGH SIDE

SERVICE

VALVE

BACKSEATED

OPEN

SV1404B

Advertising