Wiring diagram sequence of operation – Manitowoc Ice MARINE MODEL S1800 User Manual

Page 40

Advertising
background image

Electrical System

Section 6

6-2

Part Number 80-1634-3

Wiring Diagram Sequence of

Operation

SELF-CONTAINED MODELS

Initial Start-Up or Start-Up After

Automatic Shut-Off

1. WATER PURGE

Before the compressor starts, the
water pump and water dump
solenoid are energized for 45
seconds to purge old water from the
ice machine. This ensures that the
ice-making cycle starts with fresh
water.

The harvest valve(s) is also
energized during the water purge. In
the case of an initial refrigeration
start-up or auto shut-off, it stays on
for an additional
5 seconds (50 seconds total).

The air compressor energizes for the
last 10 seconds of the cycle.

Self-Contained — Water Purge

Table 6-1. Self-Contained Models

1. Water Purge (45 Seconds)

Toggle Switch

ICE

Bin Switch

Closed

Control Board Relays
#1

Water Pump

ON

#2

Harvest Valve (Left)

ON

#3

Harvest Valve (Right)

ON (When Used)

#4

Air Compressor

35 sec. OFF / 10 sec. ON

#5

Water Inlet Valve

OFF

#6

Water Dump Valve

ON

#7

Contactor Coil

Open / OFF

#7A

Compressor

OFF

#7B

Condenser Fan Motor

OFF

Safety Controls (Which could stop ice machine operation)

High Pressure Cut-Out

Closed

Main Fuse (On Control Board)

Closed

SV3137-2

(89)

(55)

(88)

High

Pressure

Cutout

Control Board

L1

Ground

(2)

(6)

(5)

(1)
(7)
(4)

L2 or N

Water Valve

Harvest Valve

(20)

(21)

(22)

(61)

Dump Valve

Water Pump

(60)

(76)

(81)

(75)

(77)

(80)

(57)

(98)

(58)

(59)

(42)

Ice Thickness

Probe

Water Level Probe

Trans.

Fuse (7a)

L2

Terminates at

Pin Connection

(99)

Contactor Coil

(56)

Air Compressor

(26)

(25)

Low DC

Voltage

Plug

Bin Switch

Clean

OFF

ICE

(2)

(1)

(6)

(8)

(9)

(74)

Compressor

Run Capacitor

(Red)

(Yellow)

Fan Motor

PTCR

(45)

(46)

(50)

(51)

(85)

Overload

(Black)

(86)

Fan Cycle

Control

L1

Contactor

Contacts

Run Capacitor

Advertising