Callpilot server installation, Callpilot server installation tasks, Rack-mounting the server – Nortel Networks NN44200-313 User Manual

Page 41

Advertising
background image

41

CallPilot server installation

This task describes the CallPilot server installation.

CallPilot server installation tasks

The following is a list of tasks you perform to install the CallPilot server. To
link to detailed procedures for each task, click the text.

•

"Rack-mounting the server" (page 41)

•

"Installing peripheral devices" (page 42)

•

"Installing cables and grounds" (page 43)

•

"Performing preboot checks" (page 45)

•

"Connecting the server to power and starting it" (page 45)

Rack-mounting the server

Perform the following procedure for four- or two-post rack-mounting.

The CallPilot server includes installation instructions for the 19” and 23”
Universal Rack Mount kits. Refer to the those instructions for more details.

Step

Action

1

Attach the inner rail to the chassis on both sides.

2

Attach the front-tab mounting bracket to the chassis on both sides.
The bracket is reversible for a flush mount install.

3

Using the four outer studs, assemble the mounting brackets to the
outer rail. Insert the four thread covers of the 4 inner studs.
For a two-post install, flip the mounting brackets so they are facing in
to each other.

Tech tip: Hand-tighten the nuts at this stage so you can adjust the
distance for the server and rack.

4

Install the two outer rail subassemblies.
Eight mounting screws are required for a four-post install. For a
two-post install, six mounting screws are required.

Nortel CallPilot

Quickstart Guide

NN44200-313

01.02

Standard

5.0

19 May 2008

Copyright © 2007-2008, Nortel Networks

.

Advertising