Table 2-9. completion network jumpers, Table 2-9, Completion network jumpers -14 – National Instruments SCXI-1121 User Manual

Page 28: Using the internal half-bridge completion

Advertising
background image

Chapter 2

Configuration and Installation

SCXI-1121 User Manual

2-12

www.natinst.com

Using the Internal Half-Bridge Completion

Your SCXI-1121 includes half-bridge completion for half-bridge and
quarter-bridge setups. The completion network consists of two
4.5 k

± 0.05% ratio tolerance resistors with a temperature coefficient of

5 ppm/°C. These resistors are connected in series. To enable the network,
you must set two jumpers for each input/excitation channel pair.

When the completion network is enabled, you cannot access the negative
input of the amplifier, which preserves the overvoltage protection of the
channel. Table 2-9 shows how to enable and disable the completion
network.

Note

When using the half-bridge completion network with a quarter-bridge setup, you

must use an extra resistor to complete the bridge. Place this resistor on the terminal block
between the positive input channel and the negative excitation output.

Table 2-9. Completion Network Jumpers

Channel

Jumpers

Enable Completion

Disable Network

(Factory Setting)

0

W1 and W2

1

W17 and W18

A B

W2

W1

1 2 3

A B

W2

W1

1 2 3

A B

W18

W17

1 2 3

A B

W18

W17

1 2 3

Advertising