Note 1: if an nt1 was not purchased go to, Step, Step action drawing – NEC VisuaLink 128/384 User Manual

Page 49: Rj45 nt1 cable

Advertising
background image

NDA-24230 Issue 2.0

Page 4-21

VisuaLink 128/384 User Guide

Chapter 4

23.

Locate the network cable (RJ45-RJ45) and
connect one end to the S/T LINE port of the
VisuaLink 128 or VisuaLink 384. Connect the
other end of the network cable into the network
interface provided in the room wall.

Note 1: If the NT1 or network switch resides 300

feet (91 meters) or more away from the
VisuaLink 128 or VisuaLink 384, it is
recommended that the TERM switch is
set to ON on the VL128.

Note 2: In the case a VL384 is being installed, the

network interface card must be taken out
of the system and the appropriate strap
must be set.

Note 3: If the VL 384 is being installed, Step 23

must be repeated three (3) times.

24.

Locate the ON/OFF switch at the upper right
outside of the cabinet. Press the switch to the ON
position.

STEP

ACTION

DRAWING

+

+

+

+

+

DC IN 5V

+

-

Serial1 Serial2/RMT

O
U

T

I

N

VIDEO2 VIDEO1 AUDIO

+

+

TEL

S/T LINE

MIC1

MIC2

MIC3

RJ45 NT1 Cable

+

+

+

+

+

DC IN 5V

+

-

Serial1 Serial2/RMT

O
U

T

I

N

VIDEO2 VIDEO1 AUDIO

+

+

TEL S/T LINE 1 S/T LINE 2 S/T LINE 3

MIC1 MIC2 MIC3

VisuaLink 384 Rear

RJ45 NT1 Cable

VisuaLink 128 Rear

ON/OFF Switch

Advertising