Warning, C. vertical penetration framing – Quadra-Fire Expression 36 QV36A-FB User Manual

Page 19

Advertising
background image

19

Quadra-Fire • Expression 36 (QV36A-FB) • 2062-900 Rev. S • 11/11

C. Vertical Penetration Framing

Installing the Ceiling Firestop

• Frame an opening 10 inches by 10 inches

whenever the vent system penetrates a
ceiling/fl oor (see Figure 6.3).

• Frame the area with the same sized

lumber as used in ceiling/fl oor joist.

• When installing a top vent vertical

termination appliance the hole should be
directly above the appliance, unless the
fl ue is offset.

• Do not pack insulation around the vent.

Insulation must be kept away from the
pipe.

Figure 6.3

ATTIC ABOVE

10 IN. (254 MM)

HOLE SHOULD MEASURE

10 IN. X 10 IN.

(254 MM X 254 MM)

INSIDE TO INSIDE

10 IN.

(254 MM)

Installing Attic Shield

Note: An additional ceiling fi restop is not
required if attic shield is used.

• Frame opening for attic shield.

• Attic shield may be installed above or

below ceiling (see Figure 6.4).

• Secure with three fasteners on each

side.

• Fold tabs at top of attic shield in toward

vent pipe. Tabs must keep vent pipe
centered within shield.

• Field construct additional shield height if

insulation is deeper than height of attic
shield.

Figure 6.4 Installing the Attic Shield

3 FASTENERS

PER SIDE

BEND TABS IN

AROUND PIPE

ATTIC SHIELD INSTALLED

BELOW CEILING

ATTIC SHIELD INSTALLED

ABOVE CEILING

Fire Hazard

Keep loose materials or blown
insulation from touching the
vent pipe.

• National building codes recommend

using attic shield to keep loose materials/
blown insulation from contacting vent.

• Hearth & Home Technologies requires

the use of an attic shield.

WARNING

Advertising