Toshiba TECRA S1 User Manual

Page 126

Advertising
background image

3 Diagnostic Programs

3.9 Communication

52

TECRA S1Maintenance Manual

Connect Timeout: Define the time that slave connecting to master (in seconds);

Test Timeout: Define the time that testing each transfer rate(in seconds);

SIR Test: Choose the transfer rates to be checked in Slow IR;

FIR Test: Choose the transfer rates to be checked in Fast IR.

Below are the operation steps:

Prepare a Master whose IrDA works normally, then run the test item in

‘Comm/IrMaster’ under Diagnostics menu; The master stays here to wait
for slave requesting.

Prepare a slave. User should choose the test item ‘Comm/IrSlave’ and set

parameters.

Below is the Slave Testing window.

Advertising