Toshiba 18 - 1250 A User Manual

Page 9

Advertising
background image

TE Series

Digital Solid State Soft Starters 18 – 1250A

2

1.1.2

Advanced Motor Protection Features

Thermal Model Electronic
Overload Protection

A sophisticated Thermal Model of the motor operation is created in the
microprocessor to accurately track all starting, stopping and running conditions
to provide maximum motor protection.

Two Stage
Overload Curves

Starting: Programmable for Class 5 or 10
Run: Programmable for Class 5 through 30 when "At-Speed" is detected.

Overload Reset

Manual (default) or automatic

Retentive Thermal Memory

Overload circuit retains thermal condition of the motor regardless of control
power status. Unit uses real time clock to adjust for off time.

Dynamic Reset Capacity

Overload will not reset until thermal capacity available in the motor is enough for
a successful restart. Starter learns and retains this information by monitoring
previous successful starts.

Current Imbalance Trip

Trip Level: 5 - 30% Imbalance in any two phases
Trip Delay: 1 -20 seconds

PTC Input Trip

Trips on greater than 750 ohms resistance on a dedicated PTC input. Can be
used with an Emergency Stop or any other External Lockout.

Over Current Trip
(Electronic Shear Pin)

Trip Level: 50 - 300% of motor FLA
Trip Delay: 1 - 20 seconds

Phase Loss

Trips on any phase current less than 20% of unit rating.
Can be disabled in programming for testing with smaller loads.

Equipment Ground Fault
Protection

Type: Residual Current Trip
Range: 5 – 90% of unit CT ratio
Trip Delay: 1 – 60 seconds

Load Loss Trip

Under Current Trip Level: 10 –90 % of motor FLA
Trip Delay: 1 – 60 seconds

Coast Down (Back Spin)
Lockout Timer

Prevents restart when motor may be spinning backwards
Coast Down Time Range: 1 – 60 minutes

Starts-per-hour Lockout

1 – 10 successful starts per hour

Minimum Time between
Starts Lockout

Range: 1 – 60 minutes between start attempts

Restart Delay

Sequential Start Feature for restarting delay after a power outage.
1-999 seconds after a power loss

Auto Reset

Can be programmed to attempt resetting after selected faults
0 – 10 Attempts, 0 – 999 minutes delay between attempts

Power Device Monitoring

Shorted SCR Lockout (1 shorted SCR) and independent Shunt Trip (multiple
shorted SCRs). Can be disabled in programming.

Advertising